DSpace DSpace 日本語
 

AIT Associated Repository of Academic Resources >
A.研究報告 >
A2 総合技術研究所研究報告 >
08号 >

Please use this identifier to cite or link to this item: http://hdl.handle.net/11133/1657

Title: 風力発電を導入したEVにおける最大負荷追従手法の実験的検討
Other Titles: Examination of Maximum Power Point Tracking on the EV for Installing on Windmill
Authors: 雪田, 和人
細江, 忠司
小田切, 雄也
後藤, 泰之
一柳, 勝宏
YUKITA, Kazuto
HOSOE, Tadashi
OTAGIRI, Yuya
GOTO, Yasuyuki
ICHIYANAGI, Katsuhiro
Issue Date: 1-Jul-2006
Publisher: 愛知工業大学
Abstract: This paper proposes that wind generator system is operated by using wind collection equipment and Maximum Power Point Tracking more and more high-efficient. As an example of the utility, it was proposed that it was used for the regeneration of electric vehicle. The efficiency upgrading of electric vehicle can be expect by introducing in addition, proposing system with the conventional regeneration. The field experiment was carried out in order to measure the effect. Regeneration energy by proposing and new regeneration system was measured. The experiment was carried out by the installation of wind collection equipment, Maximum Power Point Tracking. As the result, the wind given to the wind power generator was accelerated bywind collection equipment, and Maximum Power Point Tracking (MPPT) made the output voltage increase.
URI: http://hdl.handle.net/11133/1657
Appears in Collections:08号

Files in This Item:

File Description SizeFormat
総研8号(P53-58).pdf873.94 kBAdobe PDFView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback