DSpace DSpace English
 

AIT Associated Repository of Academic Resources >
A.研究報告 >
A2 総合技術研究所研究報告 >
08号 >

このアイテムの引用には次の識別子を使用してください: http://hdl.handle.net/11133/1657

タイトル: 風力発電を導入したEVにおける最大負荷追従手法の実験的検討
その他のタイトル: Examination of Maximum Power Point Tracking on the EV for Installing on Windmill
著者: 雪田, 和人
細江, 忠司
小田切, 雄也
後藤, 泰之
一柳, 勝宏
YUKITA, Kazuto
HOSOE, Tadashi
OTAGIRI, Yuya
GOTO, Yasuyuki
ICHIYANAGI, Katsuhiro
発行日: 2006年7月1日
出版者: 愛知工業大学
抄録: This paper proposes that wind generator system is operated by using wind collection equipment and Maximum Power Point Tracking more and more high-efficient. As an example of the utility, it was proposed that it was used for the regeneration of electric vehicle. The efficiency upgrading of electric vehicle can be expect by introducing in addition, proposing system with the conventional regeneration. The field experiment was carried out in order to measure the effect. Regeneration energy by proposing and new regeneration system was measured. The experiment was carried out by the installation of wind collection equipment, Maximum Power Point Tracking. As the result, the wind given to the wind power generator was accelerated bywind collection equipment, and Maximum Power Point Tracking (MPPT) made the output voltage increase.
URI: http://hdl.handle.net/11133/1657
出現コレクション:08号

このアイテムのファイル:

ファイル 記述 サイズフォーマット
総研8号(P53-58).pdf873.94 kBAdobe PDF見る/開く

このリポジトリに保管されているアイテムは、他に指定されている場合を除き、著作権により保護されています。

 

Valid XHTML 1.0! Powered by DSpace Software Copyright © 2002-2007 MIT and Hewlett-Packard - ご意見をお寄せください