AIT Associated Repository of Academic Resources >
A.研究報告 >
A2 総合技術研究所研究報告 >
08号 >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/11133/1657
|
Title: | 風力発電を導入したEVにおける最大負荷追従手法の実験的検討 |
Other Titles: | Examination of Maximum Power Point Tracking on the EV for Installing on Windmill |
Authors: | 雪田, 和人 細江, 忠司 小田切, 雄也 後藤, 泰之 一柳, 勝宏 YUKITA, Kazuto HOSOE, Tadashi OTAGIRI, Yuya GOTO, Yasuyuki ICHIYANAGI, Katsuhiro |
Issue Date: | 1-Jul-2006 |
Publisher: | 愛知工業大学 |
Abstract: | This paper proposes that wind generator system is operated by using wind collection equipment and Maximum Power Point Tracking more and more high-efficient. As an example of the utility, it was proposed that it was used for the regeneration of electric vehicle. The efficiency upgrading of electric vehicle can be expect by introducing in addition, proposing system with the conventional regeneration. The field experiment was carried out in order to measure the effect. Regeneration energy by proposing and new regeneration system was measured. The experiment was carried out by the installation of wind collection equipment, Maximum Power Point Tracking. As the result, the wind given to the wind power generator was accelerated bywind collection equipment, and Maximum Power Point Tracking (MPPT) made the output voltage increase. |
URI: | http://hdl.handle.net/11133/1657 |
Appears in Collections: | 08号
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|