DSpace DSpace 日本語
 

AIT Associated Repository of Academic Resources >
A.研究報告 >
A1 愛知工業大学研究報告 >
3.愛知工業大学研究報告 .B(1976-2007) >
33号 >

Please use this identifier to cite or link to this item: http://hdl.handle.net/11133/1044

Title: D-RAP工法による補強床版の改善対策に関する研究
Other Titles: D-RAP コウホウ ニヨル ホキョウ ショウバン ノ カイゼン タイサク ニカンスル ケンキュウ
Study on retrofit of bridge concrete deck by D-RAP method
Authors: 周, 明華
青木, 徹彦
ZHOU, Ming Hua
AOKI, Tetsuhiko
Issue Date: 31-Mar-1998
Publisher: 愛知工業大学
Abstract: It has been 30 years since Tomei and Meisin high way had constructed. Many bridge concrete decks, therefore, have heavy damages like fatigue cracks, which are caused by increasing traffic load and many over-weighted trucks in those decades. In this report, several repairing methods for these injured concrete decks are investigated and the fatigue test results of new developed D-RAP retrofit method conducted in Aichi Institute of Technology are introduced.
URI: http://hdl.handle.net/11133/1044
Appears in Collections:33号

Files in This Item:

File Description SizeFormat
紀要33号B(P83-94).pdf2.23 MBAdobe PDFView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback